PROJECT OVERVIEW
Two blasting companies based in Texas -- Eco Blast and Stripping and Lone Star Blasting -- worked together to blast two metal boats for their client.
The client needed:
- Marine paint, anti-fouling, stickers, and bondo removed from two 40-foot metal boats.
- A consistent surface profile on the bare metal for new paint to adhere to.
Lucky for them, DUSTLESS BLASTING® could take care of both needs in one step.
The owner had already planned on taking care of the paint work, so all the two blasters needed to do was prepare the surface.
One of the hurdles of this job, as Jeff pointed out, is persevering through the weariness that sets in your arms and shoulders.
"It was pretty cool blasting next to a battleship." - Jeff
JOB DETAILS
JOB LENGTH
5 days total
EQUIPMENT
DB500® Mobile S
OTHER TOOLS
Leaf Blower
Plastic Sheeting
BLAST MEDIA:
Copper Slag
BLASTING METHOD
100% dry
BLAST PRESSURE:
100 psi
We could get as close as we wanted because of the thick, hard metal from the bottom. But standoff was around 2-3 ft around the top."
-Jeff, Eco Blast and Stripping